69.1 yd3ph = 0.51825 ft3ps. To convert cubic yards per hour to cubic feet per second, multiply by 0.0075: 69.1 × 0.0075 = 0.51825.
How to convert cubic yards per hour to cubic feet per second
ft3ps = yd3ph × 0.0075
- 1 yd3ph = 0.0075 ft3ps (and 1 ft3ps = 133.33333 yd3ph).
- Multiply the amount by the factor: 69.1 × 0.0075 = 0.51825.
- Answer: 69.1 yd3ph = 0.51825 ft3ps.
Cubic Yards Per Hour to Cubic Feet Per Second table
| Cubic Yards Per Hour (yd3ph) | Cubic Feet Per Second (ft3ps) |
|---|---|
| 68.6 yd3ph | 0.5145 ft3ps |
| 68.7 yd3ph | 0.51525 ft3ps |
| 68.8 yd3ph | 0.516 ft3ps |
| 68.9 yd3ph | 0.51675 ft3ps |
| 69 yd3ph | 0.5175 ft3ps |
| 69.1 yd3ph | 0.51825 ft3ps |
| 69.2 yd3ph | 0.519 ft3ps |
| 69.3 yd3ph | 0.51975 ft3ps |
| 69.4 yd3ph | 0.5205 ft3ps |
| 69.5 yd3ph | 0.52125 ft3ps |
| 69.6 yd3ph | 0.522 ft3ps |
| yd3ph | ft3ps |
|---|---|
| 1 yd3ph | 0.0075 ft3ps |
| 5 yd3ph | 0.0375 ft3ps |
| 10 yd3ph | 0.075 ft3ps |
| 50 yd3ph | 0.375 ft3ps |
| 100 yd3ph | 0.75 ft3ps |
| 1,000 yd3ph | 7.5 ft3ps |